Sherwood MAXIMUS SRB3600 User Manual Page 22

  • Download
  • Add to my manuals
  • Print
  • Page
    / 29
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 21
6.5.4 External Air Leaks
1 Attach the regulator first stage to a tank short enough to totally submerge the first and second
stage in your filling station cooling water.
2. With the tank valve still turned off, flood the second stage completely with water, and then
position it mouthpiece up.
3. Turn the tank air valve on
slowly and then watch for any leaks in the first or second stage
(except for the normal flow of air from the one-way bleed valve on the first stage). Look
particularly closely at the first stage area where the adjusting module meets the body. If the
module-to-body O-ring is in the wrong groove, you will see air leaking from between the
module and the body instead of from the black one-way bleed valve system.
4. Repair any leaks.
5. Check for the correct positive air purge flow rate. See
Section 5.4, Testing of First Stage, for
the proper method.
19
18
Page view 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 28 29

Comments to this Manuals

No comments