Sherwood SR 7206 Specifications Page 17

  • Download
  • Add to my manuals
  • Print
  • Page
    / 20
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 16
17
www.sherwoodscuba.com
16. While holding the Housing (30) with the two tabs located on the shoulder of the housing below the mouthpiece
boss facing up, locate the two slots on the top of the Exhaust Cover (34). Align the two slots with the two tabs
and assemble the exhaust Cover to the Housing, complete the installation of Exhaust Cover by compressing the
bottom edge of the cover engaging the two lower slots and tabs.
17. Install a lubricated new O-ring (4) in the LP Hose (1) and attach the Hose to the Valve Body. Move the Hose
Protector (27) to the fully seated position.
18. Attach the partially assembled second stage to properly functioning first stage with an intermediate pressure set
at 135 ± 10 psi.
19. Rotate the Knob (20) to the full counterclockwise position.
SECOND STAGE ADJUSTMENT
20. Apply intermediate pressure to the second stage. If air leaks by the Poppet the Orifice may not be in the correct
position. It should automatically move to the proper position when the regulator is pressurized. Turn off the
supply pressure and then quickly reopen the supply valve to apply a surge of pressure to the second stage. This
should properly position the Orifice.
21. Insert a small probe through one of the slots in the Retainer Nut (28) to engage one of the linear slots in the
Adjustment Sleeve (2). Rotate the Adjustment Sleeve counterclockwise until a slight leak is detected and then
rotate it clockwise until the leak just stops. From this position rotate the Adjustment Sleeve clockwise through an
arc equal in length to one of the slots in the Retaining Nut.
Page view 16
1 2 ... 12 13 14 15 16 17 18 19 20

Comments to this Manuals

No comments